Mesutoglu, M.Ozkan, I.2020-03-262020-03-262014978-1-138-00149-7https://hdl.handle.net/20.500.12395/30551ISRM European Symposium -- MAY 26-29, 2014 -- Vigo, SPAINThe studies presented in this paper were carried out in two different regions. They are TKI-GLI-BLI Orhaneli lignite open pit mine region and Konya-Cumra agricultural basin, respectively. In Orhaneli mine site, to monitor deformations in 9 boreholes, inclinometer measurements were made approximately 14 times for 215 days. Similarly, in Cumra agricultural basin, using 11 boreholes established in site, these measurements were made 7 times for 784 days. In the evaluation of the measurement results, the presences of certain problems have been identified. To utilize in the evaluation studies of the inclinometer measurement results, a new approach was developed. The approach used in the project studies was presented in this paper.eninfo:eu-repo/semantics/closedAccessA new approach for evaluation of in situ inclinometer measurements based on two cases in TurkeyConference Object9951000N/AWOS:000345985300163N/A