Assembly line balancing with resource dependent task times: An application to parallel assembly lines

Küçük Resim Yok

Tarih

2013

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

IFAC Secretariat

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

In this study, Resource Dependent Assembly Line Balancing approach is adapted to the concept of Parallel Assembly Line Balancing and this problem is called Parallel Assembly Line Balancing with Resource Dependent Task Times (RDALBP). A binary integer linear mathematical model is proposed for RDALBP. The proposed model is validated on an illustrative example and a scenario analysis is performed by comparing the proposed RDALBP solutions of the illustrative problem with independent RDALB solutions for four different cycle time values. The results show that, the RDALBP provides better solutions in total cost for three out of four different cycle time scenarios. The average cost improvement of RDALBP is 8.8% compared to independent RDALB solutions. © IFAC.

Açıklama

et al.;for Management and Control;IFAC Technical Committee 3.2 on Computational;Intelligence in Control;International Federation of Automatic Control (IFAC) -;Technical Committee 5.2 - Manufacturing Modelling
7th IFAC Conference on Manufacturing Modelling, Management, and Control, MIM 2013 -- 19 June 2013 through 21 June 2013 -- Saint Petersburg -- 99324

Anahtar Kelimeler

Integer programming, Parallel assembly line balancing, Resource dependent assembly line balancing