A Total Productive Maintenance Implementation in a Manufacturing Company Operating in Insulation Sector in Turkey

Küçük Resim Yok

Tarih

2015

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

IEEE

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

In this study, to calculate Overall Resource Effectiveness (ORE), planned downtime, facility downtime, setup and adjustments, material shortages, manpower absence, operator performance losses are found out after observing 4 expanded polystyrene (EPS) machines for 23 days, in 3 shifts a day. In the light of this data readiness, facility availability, mold changeover efficiency, material availability, manpower availability, performance efficiency, quality rate values are found and ORE values for each machine are calculated. Results showed an undeniable need to implement TPM, and suggestions followed.

Açıklama

6th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO) -- MAY 27-29, 2015 -- Istanbul, TURKEY

Anahtar Kelimeler

overall resource effectiveness, overall equipment effectiveness, total productive maintenance

Kaynak

2015 6TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION, AND APPLIED OPTIMIZATION (ICMSAO)