A Total Productive Maintenance Implementation in a Manufacturing Company Operating in Insulation Sector in Turkey
dc.contributor.author | Baysal, Mehmet Emin | |
dc.contributor.author | Sumbul, Mehmet Onur | |
dc.contributor.author | Ekicioglu, Erdem | |
dc.date.accessioned | 2020-03-26T19:00:37Z | |
dc.date.available | 2020-03-26T19:00:37Z | |
dc.date.issued | 2015 | |
dc.department | Selçuk Üniversitesi | en_US |
dc.description | 6th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO) -- MAY 27-29, 2015 -- Istanbul, TURKEY | en_US |
dc.description.abstract | In this study, to calculate Overall Resource Effectiveness (ORE), planned downtime, facility downtime, setup and adjustments, material shortages, manpower absence, operator performance losses are found out after observing 4 expanded polystyrene (EPS) machines for 23 days, in 3 shifts a day. In the light of this data readiness, facility availability, mold changeover efficiency, material availability, manpower availability, performance efficiency, quality rate values are found and ORE values for each machine are calculated. Results showed an undeniable need to implement TPM, and suggestions followed. | en_US |
dc.identifier.isbn | 978-1-4673-6601-4 | |
dc.identifier.issn | 2473-4748 | en_US |
dc.identifier.scopusquality | N/A | en_US |
dc.identifier.uri | https://hdl.handle.net/20.500.12395/31803 | |
dc.identifier.wos | WOS:000380551800011 | en_US |
dc.identifier.wosquality | N/A | en_US |
dc.indekslendigikaynak | Web of Science | en_US |
dc.indekslendigikaynak | Scopus | en_US |
dc.language.iso | en | en_US |
dc.publisher | IEEE | en_US |
dc.relation.ispartof | 2015 6TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION, AND APPLIED OPTIMIZATION (ICMSAO) | en_US |
dc.relation.ispartofseries | International Conference on Modeling Simulation and Applied Optimization | |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.selcuk | 20240510_oaig | en_US |
dc.subject | overall resource effectiveness | en_US |
dc.subject | overall equipment effectiveness | en_US |
dc.subject | total productive maintenance | en_US |
dc.title | A Total Productive Maintenance Implementation in a Manufacturing Company Operating in Insulation Sector in Turkey | en_US |
dc.type | Conference Object | en_US |